PAM 710-7 — Hazardous Material Management Program

PAM 710-7 governs the Armywide management, accountability, control, and reduction of hazardous material and hazardous waste.

Search PAM 710-7

  • Publication number: PAM 710-7
  • Title: HAZARDOUS MATERIAL MANAGEMENT PROGRAM
  • Date: 03/23/2017
  • Proponent: G-4
  • Status: ACTIVE

View PAM 710-7 on armypubs.army.mil

Related publications


It covers centralized installation management, authorized use and user lists, business practices, and hazardous material control points. It sets procedures for acquisition, use, handling, reporting, return, and disposition, with sample policies and standard operating procedures.

Applies to: This document is applicable both in the continental United States and outside the continental United States (OCONUS).

Topics covered

  • Hazardous material management
  • Hazardous waste reduction
  • Centralized hazardous material control
  • Authorized use and user lists
  • Hazardous material receipt and issue
  • Hazardous material return and disposition
  • Installation HMMP committees

Questions and answers

What is PAM 710-7 intended to improve?

The core objective is to improve logistics and operational mission performance by controlling and reducing the acquisition, use, handling, and disposal of HM and the generation of HW, consistent with Army supply chain integration and sustainability objectives. (paragraph 1-6)

What does an authorized use and/or user list control?

An AUL is used to control acquisition, identify types of HM usage, estimate HW generation, and to support environmental reporting as prescribed by government agencies, and as a pollution prevention tool. (paragraph 5)

What should be done with serviceable hazardous material above immediate needs?

Quantify serviceable HM in excess of the 1-month operating level or other known immediate needs and return serviceable excesses to the HMCP. (paragraph 5)

How soon must unserviceable hazardous material be returned?

Return all unserviceable HM to the DIS HW office, as soon as the HM is determined to be unserviceable. (paragraph 5)

What must units and facilities publish for hazardous material management?

Units, activities, and facilities publish standard operating procedures (SOPs) consistent with installation and higher headquarters policy and guidance. (paragraph 5)

Ask Reggie.Bot a question about PAM 710-7