WR-ALCI21-122 — Maintenance, Distribution, And Control Of Product Engineering Design Data

WR-ALCI21-122 governs the maintenance, distribution, and control of engineering design data within the Warner Robins Air Logistics Complex.

Search WR-ALCI21-122

  • Publication number: WR-ALCI21-122
  • Title: MAINTENANCE, DISTRIBUTION, AND CONTROL OF PRODUCT ENGINEERING DESIGN DATA
  • Date: 2026-02-18

View WR-ALCI21-122 on armypubs.army.mil


The publication covers engineering design data for routed items, locally manufactured items, temporary work requests, project modification and repair workloads, and contractor-supplied data. It requires currency checks, authorized-use annotations, controlled distribution, and specified data disposition.

Applies to: It applies to all WR-ALC personnel performing work to support a production realization or verification process.

Topics covered

  • Engineering design data for routed items
  • Locally manufactured items
  • Temporary work requests
  • Project modification and repair workloads
  • Contractor-supplied engineering design data
  • Limited distribution of data
  • Data disposition

Questions and answers

What is the primary method for obtaining engineering design data?

The ATEAM is the primary method used by personnel who require engineering design data. (paragraph 1)

Can engineering data ordered for WR-ALC be released to foreign nationals or contractors?

Engineering data ordered for use by WR-ALC will not be released in any manner, or by any means, to a foreign national/government/contractor. (paragraph 1)

When must engineering design data be destroyed or returned to planning?

Unless otherwise specified by the planning organization, all personnel will ensure engineering design data is destroyed or returned to planning immediately after each individual work request is completed. (paragraph 1)

What happens when routed engineering design data is 90 or more days old?

If engineering design data was last IET-stamped 90 or more days prior to the date of work request, the currency of the engineering design data must be verified with the source/provider or cognizant engineering authority and documented.

What engineering design data may be located in production areas?

Production supervisors ensure all engineering design data is current and only engineering design data required in support of active work orders is located in the production areas.