TINKERAFBI10-206 — Emergency Mass Notification Procedures

TINKERAFBI10-206 governs emergency notification procedures for protecting Tinker AFB personnel during hazardous and threatening events.

Search TINKERAFBI10-206

  • Publication number: TINKERAFBI10-206
  • Title: EMERGENCY MASS NOTIFICATION PROCEDURES
  • Date: 2026-08-26

View TINKERAFBI10-206 on armypubs.army.mil


It covers notification authorities, emergency event assessment, protective measures, disaster response force activation, and five primary notification methods. It requires accurate, timely dissemination through systems including AtHoc, Giant Voice, the command LMR net, and Pyramid Notifications.

Topics covered

  • Emergency mass notification
  • Hazardous weather notifications
  • Force Protection Condition changes
  • Active shooter notifications
  • AtHoc system alerts
  • Giant Voice activation
  • Command Land Mobile Radio net
  • Pyramid Notifications

Questions and answers

Who can authorize emergency mass notification at Tinker AFB?

The 72d Air Base Wing Commander (72 ABW/CC), 72 ABW Deputy Commander (72 ABW/CD), or 72d Mission Support Group Commander (72 MSG/CC) in 72 ABW/CC’s absence are the sole authorities for implementing the provisions of this instruction.

When can emergency mass notification be initiated without verbal or text authorization?

The only exception to a verbal and/or text authorization from 72 ABW/CC or designated representative would be in the case of a time critical emergency mass notification to ensure the safety of personnel (e.g., tornado, active shooter, fire, etc.).

What must each organization do for emergency notifications?

Each organization must develop internal procedures to ensure compliance and widest dissemination to installation personnel at the time of the event.

What protective measures must personnel take during an emergency?

Personnel must take immediate protective measures to enhance personal safety to the maximum extent possible.

How many primary emergency notification methods are available?

Five primary methods are available that provide timely, accurate information to all installation personnel.

Ask Reggie.Bot a question about TINKERAFBI10-206