SLD45I91-710 — Launch Shelter Certification Process

SLD45I91-710 governs the launch shelter certification process and shelter procedures for toxic-material release events at CCSFS.

Search SLD45I91-710

  • Publication number: SLD45I91-710
  • Title: LAUNCH SHELTER CERTIFICATION PROCESS
  • Date: 2024-09-04

View SLD45I91-710 on armypubs.army.mil


The publication covers shelter elements, certification requests, facility inspections, approval decisions, and shelter procedures. It requires personnel to secure shelters, sign in, limit telephone use, and receive procedural briefings.

Topics covered

  • Launch shelter certification
  • Toxic launch materials
  • Shelter certification requests
  • Facility inspections and evaluations
  • Shelter entry and sign-in
  • Emergency telephone usage
  • Shelter procedures

Questions and answers

What hazards can be present in a launch exhaust plume?

The exhaust plume created by firing of the solid rocket motors (SRMs) during a nominal launch contains hazardous materials (primarily hydrogen chloride, an irritant gas). (paragraph 91-204)

When must launch shelters be established?

Under these conditions, all personnel must be protected from the potential toxic hazards. This requires that launch shelters be established. (paragraph 91-204)

Who should request that a building be certified as a launch shelter?

The request that a building be certified as a shelter should come from the facility manager responsible for the building. (paragraph 91-204)

What does the facility manager submit for shelter certification or recertification?

The facility manager submits a request, with justification, for certification or recertification by either e-mail or letter to the 45 SEL and Operations Safety support contractor. (paragraph 91-204)

What must personnel do with launch shelter windows and doors?

Ensure all windows and doors are secured (doors should be guarded). (paragraph 3)

Ask Reggie.Bot a question about SLD45I91-710