SLD45I21-105 — Crash Damaged Or Disabled Aircraft Recovery (cddar) Program

SLD45I21-105 governs the Crash Damaged or Disabled Aircraft Recovery program for aircraft recovery and airfield restoration.

Search SLD45I21-105

  • Publication number: SLD45I21-105
  • Title: CRASH DAMAGED OR DISABLED AIRCRAFT RECOVERY (CDDAR) PROGRAM
  • Date: 2026-03-05

View SLD45I21-105 on armypubs.army.mil


It covers recovery procedures at Patrick Space Force Base and Cape Canaveral Space Force Station, including runway removal conditions and off-base response. It requires supporting organizations to prepare personnel and equipment for rapid deployment and addresses foreign aircraft mishaps and training.

Applies to: The Crash Damaged or Disabled Aircraft Recovery (CDDAR) program is applicable to all organizations tasked to support recovery operations, to include tenant units, and transient aircraft.

Topics covered

  • Aircraft recovery operations
  • Airfield restoration priorities
  • Runway removal conditions
  • Foreign aircraft mishaps
  • Off-base crash recovery
  • CDDAR equipment and personnel
  • Tenant and transient aircraft support

Questions and answers

What is the first priority during crashed, damaged, or disabled aircraft recovery?

The first priority focuses on reconstitution of the runway/airfield environment suitable for operational use. (paragraph 1)

When must an emergency runway be cleared?

The runway must be cleared as soon as possible; i.e., mission priority alert missions, In-flight Emergencies, or as directed by the EOC. (paragraph 2)

When may the Recovery/Investigation Phase be waived?

In the event of an Emergency or Urgent removal condition, the Recovery/Investigation Phase may be waived by the SLD 45/CC or designated representative. (paragraph 2)

Who approves clearing aircraft or wreckage when both PSFB runways are closed?

The SLD 45/CC, or designated representative, is the only individual authorized to approve this course of action. (paragraph 2)

What happens before the entire off-base crash recovery team is dispatched?

In coordination with the civilian IC, the CDDAR Team Chief, contractors, and the initial response team will visit the site to review the situation to determine equipment requirements prior to dispatching the entire team. (paragraph 2)

Ask Reggie.Bot a question about SLD45I21-105