PACAFI21-105_15WGSUP — Fabrication Program

PACAFI21-105_15WGSUP governs weapon system and support equipment maintenance management, including aircraft corrosion control.

Search PACAFI21-105_15WGSUP

  • Publication number: PACAFI21-105_15WGSUP
  • Title: FABRICATION PROGRAM
  • Date: 2026-02-01

View PACAFI21-105_15WGSUP on armypubs.army.mil


It contains requirements for aircraft paint scoring, washing, clear water rinses, static display aircraft, and aerospace equipment coating. It also addresses corrosion prevention training, hazardous material lists, inspections, scheduling, and documentation.

Applies to: This publication applies to all PACAF units and AFRC/ANG (ARC) Classic Associate units.

Topics covered

  • Aircraft corrosion control
  • Aircraft paint scoring
  • Aircraft washing and clear water rinses
  • Static display aircraft maintenance
  • AGE paint coating
  • Corrosion prevention training

Questions and answers

When must aircraft paint scoring be completed?

Aircraft paint scoring will be completed during each Home Station Check (HSC) and no later than 30 days prior to scheduled aircraft refurbs by qualified (5- or 7-level) Aircraft Structural Maintenance personnel.

How often must static display aircraft be washed?

Static display aircraft will be washed quarterly.

What must a post wash inspection verify for static display aircraft?

A post wash inspection must be accomplished by either the COR (if washed per contract) or the Wing Corrosion Manager (if washed organically) to ensure aircraft is free from all dirt, grease, excrement, or any other contaminants.

When may an aircraft be moved from the wash pad?

At no time may an aircraft be moved from the wash pad until the CTK is secure and the inspection has been completed.

Ask Reggie.Bot a question about PACAFI21-105_15WGSUP