OO-ALCI21-110 governs policies, responsibilities, and procedures for coordinating and managing Ogden Air Logistics Complex facilities.
View OO-ALCI21-110 on armypubs.army.mil
It covers group leadership, facility engineering, energy management, electrical preventive maintenance, and facility manager duties. The instruction requires planning, appointment, training, documentation, and maintenance activities across these programs.
Preside over the development of a Facilities Strategic Deployment Plan (FSDP) for their group. Ensure the group plan is consistent with the OO-ALC overall business and facility objectives as outlined in the complex IADP. (paragraph 2)
The first word of the title must be “Convert”, “Maintain”, “Repair”, “Renovate”, “Construct”, “Add”, “Consolidate”, or “Demolish.” (paragraph 2)
The scope of the OO-ALC EnMS applies to the entire OO-ALC organization and operations within Hill AFB. (paragraph 4)
According to the memorandum of understanding between the 75 CEG and the 309 MXSG, 309 MXSG is responsible for maintaining all electrical systems inside the building at 480V and below. (paragraph 4)
Primary/alternate FMs must attend CE FM training within 90 days of being assigned FM duties. Failure to attend will result in their removal from the FM listing. (paragraph 4)