LITTLEROCKAFBI21-109 — Aircraft Wash Facility Procedures

LITTLEROCKAFBI21-109 governs aircraft wash facility procedures, including wash crew and owning aircraft maintenance unit responsibilities.

Search LITTLEROCKAFBI21-109

  • Publication number: LITTLEROCKAFBI21-109
  • Title: AIRCRAFT WASH FACILITY PROCEDURES
  • Date: 2022-10-27

View LITTLEROCKAFBI21-109 on armypubs.army.mil


It addresses contracted aircraft washing, wash rack facility management, scheduling, safety training, inspections, preparation, and Hangar 233 functions. It requires aircraft preparation, qualified and trained personnel, documented checklists and forms, facility cleanup, and coordination for delays and inspections.

Applies to: This instruction applies to 19 Maintenance Group, 314th Maintenance Group and 189th Maintenance Group.

Topics covered

  • Aircraft wash scheduling
  • Wash rack safety training
  • Aircraft cleanliness inspections
  • Aircraft preparation
  • ISO wash coordination
  • Hangar 233 facility use

Questions and answers

When must an aircraft be prepared and positioned for a scheduled wash?

AMUs will tow their own aircraft to and from the wash rack. Aircraft must be prepped and in place by 0700 of the scheduled wash. (paragraph 4)

What must initial safety training for wash personnel include?

Initial safety training will include; use and servicing of the wash rack JLG 44e high lift, proper use of safety and personal protective equipment and wash rack procedures before starting any washes. (paragraph 2)

What must the wash crew supervisor complete before releasing an aircraft?

Aircraft will not be signed off and released by the wash crew supervisor until the facility is cleaned, all tools and consumables are inventoried, and lubricants properly stored. (paragraph 2)

What aircraft preparation is required before entering the wash rack?

Ensure the aircraft is properly prepped prior to entering the wash rack, to include the removal of chain boxes, lowering flaps, flap carriage covers, air deflector doors opened, belly band removed (if applicable), T.O.’s removed from floor area storage, loose equipment and boxes removed, any panels requiring removal for regular or ISO wash, batteries disconnected, applicable engine cowls opened, PMA removed (J Model only) and cargo floor rollers on applicable aircraft. (paragraph 4)

When must ISO aircraft due for NDI procedures be prepared and positioned?

Ensure ISO aircraft due NDIs, X-ray, ultrasound or eddy current are prepped and in place IAW PS&D shared resources schedule by 0400 of the scheduled wash. (paragraph 4)

Ask Reggie.Bot a question about LITTLEROCKAFBI21-109