DAFI91-202_AFMCSUP_AEDCSUP governs additional system safety, system software safety, and risk acceptance guidance for AEDC.
Search DAFI91-202_AFMCSUP_AEDCSUP
View DAFI91-202_AFMCSUP_AEDCSUP on armypubs.army.mil
It establishes AEDC processes for hazard analysis, risk assessment, software safety, risk control validation, and risk approval across a system’s life cycle. It sets approval, notification, reassessment, and review requirements for high, medium, and low risks.
Applies to: This publication applies to all AEDC personnel.
High Risk will be determined using the AEDC risk assessment matrix and will require approval by the AEDC/CC.
High Risk hazards will be reviewed on a yearly basis or when modifications to the system occur.
Medium Risk hazards will require approval from the responsible AEDC Group or Division commander/director.
Low Risk hazards will be reviewed every three years or when modifications to the system occur.
The AEDC System Safety Process consists of analyzing for risk, documenting that analysis, reviewing the analysis, verifying the risk controls are successfully validated and verified, and finally obtaining risk approval using the process shown in Figure A6.1.).