AFTTP3-32.33V2 governs expedient construction and repair of roads, drainages, and protective structures when standard resources are unavailable.
View AFTTP3-32.33V2 on armypubs.army.mil
It covers environmental considerations, safety practices, construction materials, soil conditions, soil classification, field identification, and expedient road and drainage systems. It provides ideas and guidance for Air Force civil engineer craftsmen and does not supersede applicable legal requirements.
Applies to: It applies to AF, Air National Guard, and AF Reserve Command CE units.
The expedient methods provided here are primarily applicable during wartime and overseas contingency operations, and force beddown at initial contingency locations outside the United States (US) with shortages of standard construction materials.
Some expedient methods may be applicable during disaster recovery operations when immediate action is necessary and resources are limited.
Expedient engineering does not preclude using normal engineer practices where time and materials are available.
The information in this publication does not supersede any legal requirements (domestic US law for operations in the US and for operations outside the US: US law with extraterritorial application, applicable international agreement requirement, or combatant command directive) that specify how things must be done.
Ensure that all records created as a result of processes prescribed in this publication are maintained in accordance with (IAW) Air Force Manual (AFMAN) 33-363, Management of Records, and disposed of IAW the Air Force Records Disposition Schedule (RDS) in the Air Force Records Information Management System (AFRIMS).