AFTTP3-32.14 — Alternate Installation Sequence For Emergency Airfield Lighting System After Major Attack

AFTTP3-32.14 governs alternate installation sequences for Emergency Airfield Lighting Systems after a major attack.

Search AFTTP3-32.14

  • Publication number: AFTTP3-32.14
  • Title: ALTERNATE INSTALLATION SEQUENCE FOR EMERGENCY AIRFIELD LIGHTING SYSTEM AFTER MAJOR ATTACK
  • Date: 2024-01-19

View AFTTP3-32.14 on armypubs.army.mil


It covers EALS resources, preinstallation actions, MOS layout and marking, taxiway installation, safety, and PPE. It describes required planning factors and an alternate sequence for contingency airfield lighting systems.

Applies to: This publication applies to the Regular Air Force, the Air Force Reserve, and the Air National Guard.

Topics covered

  • Emergency Airfield Lighting System installation
  • Alternate installation sequences
  • EALS equipment and resources
  • Preinstallation actions
  • MOS layout and marking
  • Taxiway installation procedures
  • Safety and Personal Protective Equipment

Questions and answers

What does AFTTP3-32.14 describe for contingency airfield lighting?

Specifically, it describes required resources, planning factors, and an alternate installation sequence of contingency airfield lighting systems.

What changes were made to safety and PPE requirements?

Changes include procedure, safety, and Personal Protective Equipment (PPE) requirements during Rapid Airfield Damage Recovery (RADR) operations.

What is the EALS designed for?

The EALS is designed to be rapidly installed at contingency airfields or at other locations that need temporary airfield lighting.

Ask Reggie.Bot a question about AFTTP3-32.14