AFMCI21-104 — Controlled Interval Extension (cie) Programs

AFMCI21-104 governs procedures for establishing and monitoring Controlled Interval Extension programs for aerospace equipment.

Search AFMCI21-104

  • Publication number: AFMCI21-104
  • Title: CONTROLLED INTERVAL EXTENSION (CIE) PROGRAMS
  • Date: 2024-05-09

View AFMCI21-104 on armypubs.army.mil


It covers CIE program responsibilities, PDM interval evaluation, aircraft selection, plateaus, sample sizes, and inspection requirements. It requires monitoring safety, reliability, readiness, and cost effectiveness when extending or reducing intervals.

Applies to: This publication applies to all AFMC Regular Air Force.

Topics covered

  • Controlled Interval Extension programs
  • Programmed depot maintenance intervals
  • CIE plateaus and sample sizes
  • Analytical Condition Inspection
  • Special inspection requirements
  • Aircraft readiness and cost effectiveness

Questions and answers

What do CIE programs establish?

CIE programs set up controlled conditions for extending or reducing maintenance and inspection intervals without sacrificing safety of flight or reliability. (paragraph 1)

How should PDM intervals be determined?

Programmed depot maintenance (PDM) intervals are best determined by evaluating aircraft safety and reliability requirements, compared to weapon system and cost effectiveness. (paragraph 3)

How long is the time between CIE plateaus usually?

The time between plateaus is usually 6 to 12 months. (paragraph 1)

When are CIE programs not required?

Note: CIE programs are not required for MDS forces of 36 or less. (paragraph 1)

Who can change CIE sample sizes?

The MAJCOM is the authority for changes to the CIE sample sizes. (paragraph 1)

Ask Reggie.Bot a question about AFMCI21-104