AFMAN11-2UH-1NV3CL-1 governs UH-1N crew briefing guides and checklists for flying operations, including mission briefings and preflight procedures.
View AFMAN11-2UH-1NV3CL-1 on armypubs.army.mil
It contains aircrew, specialized, in-flight, AIE, and paradrop briefing guides and checklists. Compliance is mandatory, and aircrew will use abbreviated checklists during mission planning and execution.
Applies to: This checklist compliments AFMAN 11-2UH-1NV3, UH-1N Helicopter Operations Procedures, and is applicable to all subordinate flying units that operate the UH-1N aircraft.
If any nicks or excessive fraying to the point of broken strands are found, do not use the rope ladder for live operations, as serious injury or death may result.
Anchor cable will be inspected once per flight/sortie regardless of the number of iterations performed.
Do not use a rope that is severely frayed (light fraying on the rope from normal use does not weaken the rope). (paragraph 3)
Do not use a rope when any single strand is cut halfway through. (paragraph 4)
Inspect main ladder straps for dry-rot, holes, nicks and excessive fraying. (paragraph 6)