AFMAN11-2HH-60WV3_AETCSUP_AETCGM2026-01 — Hh-60w Operations Procedures

AFMAN11-2HH-60WV3_AETCSUP_AETCGM2026-01 governs HH-60W rescue hoist and electrostatic discharge cable procedures for AETC aircrew.

Search AFMAN11-2HH-60WV3_AETCSUP_AETCGM2026-01

  • Publication number: AFMAN11-2HH-60WV3_AETCSUP_AETCGM2026-01
  • Title: HH-60W OPERATIONS PROCEDURES
  • Date: 2026-03-17

View AFMAN11-2HH-60WV3_AETCSUP_AETCGM2026-01 on armypubs.army.mil


It requires review of Flash Bulletin 24-14 before hoist operations using the ESDC and specifies ESDC use when relative humidity is at or below 40%. It also addresses abnormal static discharge, including hoist termination, incident logging, and medical evaluation after a static shock.

Applies to: This guidance is applicable to all AETC assigned, attached, and gained HH-60W aircrew.

Topics covered

  • Rescue hoist operations
  • Electrostatic discharge cable
  • Abnormal static discharge
  • Hoist operation termination
  • Static shock reporting

Questions and answers

Is non-live hoisting allowed without an ESDC?

Non-live hoisting is authorized without restriction (with or without the use of an ESDC correctly attached to the rescue hook eyelet).

What counts as abnormal static discharge during hoist operations?

Abnormal static discharge includes repetitive popping or clicking noise over the ICS which interferes with normal communication, any static shock while not in contact with the ground, or continued discharge not related to the device.

What must aircrew do after abnormal static discharge during a mission?

Aircrew experiencing abnormal static discharge during missions must weigh the risk to personnel against the need to continue hoisting. Aircrew should also consider alternative insertion/extraction methods and other training remaining on the mission.

Ask Reggie.Bot a question about AFMAN11-2HH-60WV3_AETCSUP_AETCGM2026-01