AFMAN11-2ERQ-4V1 — E/rq-4 Crew Training

AFMAN11-2ERQ-4V1 governs minimum Air Force standards for training and qualifying personnel who operate USAF E/RQ-4 aircraft.

Search AFMAN11-2ERQ-4V1

  • Publication number: AFMAN11-2ERQ-4V1
  • Title: E/RQ-4 CREW TRAINING
  • Date: 2020-02-04

View AFMAN11-2ERQ-4V1 on armypubs.army.mil


AFMAN11-2ERQ-4V1 covers unresolved issues from previous reports, six-month status and issues, critical training conditions, and commander comments. Each squadron must provide a PowerPoint slide and a projection of its ability to accomplish 12 month RAP requirements.

Applies to: This manual applies to all civilian employees and uniformed members of the Regular Air Force and Air Force Reserve (AFR) personnel who operate USAF E/RQ-4 aircraft.

Topics covered

  • Previous report results
  • Six-month status and issues
  • Critical training issues
  • LIMFACS and shortfalls
  • AEF training issues
  • RAP training health
  • Commander’s comments

Questions and answers

What must each squadron provide for the reporting period?

Each squadron is to provide a PowerPoint® slide encompassing the four months since the last report. (paragraph 2)

What MQT completion time is identified as a critical issue?

MQT is averaging more than 120 days (per person) to complete. (paragraph 2)

What upgrade level is identified as a critical issue?

Upgrades are less than 50% of desired number to maintain a productive training environment commensurate to train to RAP standards. (paragraph 2)

What must the commander project in the comments?

Provide a projection of the squadron’s ability to accomplish 12 month RAP requirements. (paragraph 3)

Ask Reggie.Bot a question about AFMAN11-2ERQ-4V1