AFMAN11-2EC-130JV2 governs EC-130J aircrew evaluation requirements and grading criteria for ground and flight phases.
View AFMAN11-2EC-130JV2 on armypubs.army.mil
It covers flight planning, airdrop data, fuel planning, aircraft configuration, load operations, SCA procedures, and degraded operations. It requires graded performance for applicable evaluation events, including power-up procedures and mission execution support.
Applies to: This guidance applies to all individuals performing crew duties on any C-130J variant.
Completed a flight plan in accordance with applicable directives.
Completed Computed Air Release Point (CARP) in accordance with applicable directives. (paragraph 3-1)
Used correct entering arguments (temperture deviation, altitudes, drag index, gross weight, cargo weight, etc.) for manual or computer generated fuel plans. (paragraph 3-3)
Adequate systems knowledge to perform power up procedures to meet event requirements. Time to power up: less than 15 minutes. (paragraph 5-02)
Accurately planned a passenger/cargo load and met aircraft center of gravity (CG) limits. (paragraph 3-02)