AFMAN11-2C-21V1 governs C-21 aircrew training for Operational Support Airlift and Executive Airlift aircraft.
View AFMAN11-2C-21V1 on armypubs.army.mil
It covers qualification, MQT, in-unit training time limits, flying training, instructor training, and training documentation. Compliance with Attachment 2 is mandatory.
Applies to: This manual applies to all civilian employees and uniformed members of the Regular Air Force.
Training time starts with the first significant training event contributing to qualification, certification, or upgrade or 45 calendar days after a member’s reporting to the unit (attached or assigned) following completion of the formal school, whichever occurs first. (paragraph 1-4)
Sq/CC may extend training time up to 60 days. No notification to MAJCOM/A3T (or equivalent) is required. (paragraph 1-4)
PCO requires a formal training folder or electronic equivalent (e.g., GTIMS) to document required training and certification. (paragraph 1-4)
Structure unit flying training missions to achieve optimum training. Any by-product airlift opportunity resulting from training shall not degrade the intended training and will comply with applicable Department of Defense (DoDI) Instruction 4515.13-R, Air Transportation Eligibility, AFI 11-401, Aviation Management, AFMAN 11-202V1, and applicable MAJCOM guidance. (T-0). (paragraph 1-4)
Unless prohibited or restricted specifically by weapon system operating procedures or theater operations order (OPORD), the OG/CC exercising operational control may approve upgrade, qualification, or special qualification training on operational missions. (paragraph 1-4)