AFMAN11-223(I)V3 — Multiservice Helicopter Sling Load: Dual-point Load Rigging Procedrues

AFMAN11-223(I)V3 governs dual-point rigging procedures for helicopter sling loads, including equipment certification and load preparation.

Search AFMAN11-223(I)V3

  • Publication number: AFMAN11-223(I)V3
  • Title: MULTISERVICE HELICOPTER SLING LOAD: DUAL-POINT LOAD RIGGING PROCEDRUES
  • Date: 2013-07-05

View AFMAN11-223(I)V3 on armypubs.army.mil


It covers sling-load principles, classifications, certification, waivers, general rigging instructions, and detailed procedures for vehicles, trailers, generators, weapons, shelters, and containers. It requires specified materials, preparation steps, and equipment conditions for certified loads.

Topics covered

  • Helicopter sling-load certification
  • Dual-point rigging procedures
  • Wheeled vehicle rigging
  • Trailer rigging
  • Generator rigging
  • Howitzer and weapons-system rigging
  • Shelter and container rigging

Questions and answers

Where should services submit requests for waivers?

Services should submit requests for waivers to their respective points of contact.

How many people can prepare and rig the M35A2 modified cargo truck load?

Two persons can prepare and rig this load in 15 minutes. (paragraph 2-46)

How full can the fuel tank be when preparing the M35A2 modified cargo truck?

Ensure the fuel tank is not over 3/4 full. (paragraph 2-46)

What sling set is required to rig the M35A2 modified cargo truck?

Sling set (25,000-pound capacity) with one additional apex fitting. (paragraph 2-46)

Ask Reggie.Bot a question about AFMAN11-223(I)V3