AFMAN11-223(I)V2 governs certified single-point rigging procedures for multiservice helicopter sling loads.
View AFMAN11-223(I)V2 on armypubs.army.mil
It contains procedures for wheeled vehicles, trailers, mounted generators, truck and towed combinations, weapons systems, engineer equipment, shelters, and containers. Rigging paragraphs include load descriptions, required materials, completion steps, and applicability information.
Derigging is the reverse of the preparation and rigging procedures.
A static discharge person is not required when using a reach pendant. (paragraph 7-1)
Paragraphs 7-2 and 7-3 give detailed instructions for rigging loads. (paragraph 7-1)
Position the web ring on top of the forward end of the breech. Route outer sling legs 1 and 2 to the front of the howitzer and inner sling legs 3 and 4 to the rear. (paragraph 1)