AFI21-101_PACAFSUP_ADD_B — Pacaf: Aircraft And Equipment Maintenance Management (f-35)

AFI21-101_PACAFSUP_ADD_B governs aerospace equipment maintenance management policies and procedures for F-35 aircraft in PACAF.

Search AFI21-101_PACAFSUP_ADD_B

  • Publication number: AFI21-101_PACAFSUP_ADD_B
  • Title: PACAF: AIRCRAFT AND EQUIPMENT MAINTENANCE MANAGEMENT (F-35)
  • Date: 2020-06-10

View AFI21-101_PACAFSUP_ADD_B on armypubs.army.mil


The publication addresses F-35 maintenance concepts, prognostic inspections, support equipment, technical data, and readiness systems. It requires maintenance actions to use verified JTD and maintenance requirements to be managed through ALIS and related systems.

Applies to: This addendum applies to the Air National Guard (ANG) or Air Force Reserve Command (AFRC) when assigned to Classic Associate Units supporting PACAF units.

Topics covered

  • F-35 maintenance management
  • Prognostic maintenance inspections
  • O+ scheduled maintenance
  • Support equipment maintenance
  • Alternate Mission Equipment maintenance
  • Technical data action requests
  • Autonomic Logistics Information System
  • Verified Joint Technical Data

Questions and answers

How must maintenance units use AFI21-101_PACAFSUP_ADD_B with the PACAF supplement?

Maintenance units will use this instruction in conjunction with the PACAF supplement to AFI 21-101; if a conflict exists between the PACAF supplement and this addendum the addendum will take precedence.

How are F-35 Air System problems reported?

Action Requests (AR) are the primary method of problem reporting for the F35 Air System.

How must prognostics and health management be tracked?

Prognostics and Health Management (PHM) will be viewed and tracked in the same manner as scheduled maintenance inspections, develop local Maintenance Management Production Asset Inspection Requirements (MM-PAIRS). (T-2).

What maintenance concept does the F-35 Joint Program employ?

The F-35 Joint Program employs a 2 level maintenance concept defined as organizational and depot levels of maintenance.

Where must program provided support equipment scheduled maintenance be managed and documented?

Program provided Support Equipment (SE) scheduled maintenance will be managed, tracked and documented within Computerized Maintenance Management System (CMMS). (T-2).

Ask Reggie.Bot a question about AFI21-101_PACAFSUP_ADD_B