AFH10-222V12 — Guide To Bare Base Mechanical Systems

AFH10-222V12 governs setup and operation of mechanical systems used during bare base operations.

Search AFH10-222V12

  • Publication number: AFH10-222V12
  • Title: GUIDE TO BARE BASE MECHANICAL SYSTEMS
  • Date: 2012-03-08

View AFH10-222V12 on armypubs.army.mil


It covers the M-80 Water Heater, ADR-300, FDECU, and 130K Portable Heater, including site selection, layout, components, and shutdown. It states that applicable technical orders, AFPAM 10-219, Vol 5, and Silver Flag training support effective operation under contingency conditions.

Applies to: This publication applies to all Air Force active duty, Air National Guard (ANG), and Air Force Reserve Command Civil Engineer units.

Topics covered

  • M-80 Water Heater
  • Advanced Design Refrigerator, 300 Cubic Foot
  • Field Deployable Environmental Control Unit
  • 130K Portable Heater
  • Bare base mechanical system safety
  • Mechanical system setup procedures
  • Mechanical system operation
  • Mechanical system shutdown procedures

Questions and answers

What information and training support operation under contingency conditions?

When coupled with information contained in the applicable technical orders and Air Force Pamphlet (AFPAM) 10-219, Vol 5, Bare Base Conceptual Planning Guide, and instruction received at Silver Flag training sites, personnel should be capable of effectively setting up and operating the equipment under contingency conditions.

What equipment was added in the revised publication?

Items added include the ADR-300 Refrigerator, Field Deployable Environmental Control Unit, and the 130K Portable Heater.

Ask Reggie.Bot a question about AFH10-222V12