AFGSCI32-1005 — Intercontinental Ballistic Missile (icbm) Real Property/real Property Installed Equipment (rp/rpie) Responsibilities

AFGSCI32-1005 governs ICBM real property, real property installed equipment, infrastructure, and equipment responsibilities.

Search AFGSCI32-1005

  • Publication number: AFGSCI32-1005
  • Title: INTERCONTINENTAL BALLISTIC MISSILE (ICBM) REAL PROPERTY/REAL PROPERTY INSTALLED EQUIPMENT (RP/RPIE) RESPONSIBILITIES
  • Date: 2019-02-19

View AFGSCI32-1005 on armypubs.army.mil


AFGSCI32-1005 covers missile engineering, civil engineering operations, maintenance files, scheduling, welding, water utilization, and supply support. It also includes training requirements and requires implementation within 180 days unless specific paragraphs state otherwise.

Applies to: This instruction applies to Air Force Global Strike Command and Air Force Space Command Civil Engineer Squadrons with Missile Engineering support personnel, operational, and test/ training ICBM units.

Topics covered

  • ICBM real property and installed equipment
  • Missile engineering
  • Civil engineer operations
  • Water utilization
  • Maintenance files
  • IIE scheduling procedures
  • Welding
  • Base-level supply support

Questions and answers

How quickly must AFGSCI32-1005 requirements be implemented?

Requirements of this publication must be implemented within 180 days unless otherwise noted within specific paragraphs.

How long is the training valid for missile support personnel?

Training is valid through the last day of the anniversary month. (paragraph 9)

Can overdue personnel dispatch before completing overdue training?

Overdue personnel may NOT dispatch until the over-due training has been satisfactorily reaccomplished. (paragraph 9)

What annual refresher training is required for personnel maintaining CEM and TO files?

Refresher training on posting and filing procedures. Annual requirement for those individuals that maintain individual files of CEMs and TOs. (paragraph 8)

What must be done with IIE modifications performed by BCE or contracts?

All IIE modifications performed by BCE or contracts shall be documented in Integrated Maintenance Data System (IMDS). IMDS will be used to schedule, track, and document IIE modification work. (paragraph 2-72)