96TWI63-100 governs life cycle systems engineering for 96th Test Wing Improvement and Modernization projects and assigns engineering accountability.
View 96TWI63-100 on armypubs.army.mil
The publication addresses Technical Authority roles, organizational systems engineering processes, Program Management Plans, and oversight of TIPP projects. It requires systems engineering processes to be documented and states that “shall” statements are mandatory unless waived.
Applies to: This instruction applies to all 96 TW organizations that are proposing, planning, executing, and reporting on TIPP projects.
As designated by AFTC/CC Memorandum, the 96th Test Wing Technical Director (96 TW/CT) is delegated the responsibilities of wing TA. (paragraph 2)
Ensure 96 TW SE processes and documents (instructions and procedures) are reviewed at least once every two years following their implementation or publication, and updated as required. (paragraph 2)
Ensure each 96 TW group and/or designated squadrons, which manage TIPP projects, follow this instruction. (paragraph 2)
Review and assess proposed needs and solutions to ensure they meet the requirements of the 96 TW T&E Enterprise (reference AFI 99-109). (paragraph 2)
All “shall statements” in this instruction are mandatory unless waived. (paragraph 63-100)