46TWI23-101 — Materiel Control

46TWI23-101 governs responsibilities and procedures for ordering, backordering, and tracking parts with IMDS and ES-S.

Search 46TWI23-101

  • Publication number: 46TWI23-101
  • Title: MATERIEL CONTROL
  • Date: 2011-03-16

View 46TWI23-101 on armypubs.army.mil


The instruction covers supply support units, requirements processing, repair cycle processing, non-MICAP requirements, inoperative IMDS procedures, and removal of bits and pieces from condemned assets. It requires processing, tracking, documentation, repair-cycle timelines, approvals, tagging, and turn-in actions.

Applies to: It applies to all personnel assigned to the 46 TW and to all agencies involved with maintenance on aircraft/equipment maintained by the 46 TW on Eglin AFB, to include TDY locations that utilize IMDS (Test, Measurement, and Diagnostic Equipment (TMDE) will use PMEL Automated Management System (PAMS).

Topics covered

  • Parts ordering and backordering
  • Supply Control Logs
  • Reparable asset processing
  • DIFM status management
  • Inoperative IMDS procedures
  • Condemned asset bits and pieces
  • Economic repair criteria
  • Material tagging and turn-in

Questions and answers

What records must supply support units maintain for parts ordered from 96 LRS?

Maintain AF Form 2413, Supply Control Log; AF Form 2005, Issue/Turn-In Request, or a locally developed computer log (i.e., automated log in PAMS), recording all parts ordered from 96 LRS; verify status with the Daily Document Register (D04), Priority Monitor Report (D18), and the Monthly Due-out Validation Listing (M30) or use printouts of requests made via the supply interface in lieu of AF Form 2413 and AF Form 2005. (paragraph 2)

How quickly must MICAP, 2LM, and agile logistics reparable assets reach the repair shop?

The 46 TW standards for movement of property are: MICAP, 2LM, and agile logistics- reparable assets to the repair shop within 1 hour after removal from aircraft or serviceable part receipt from Base Supply. (paragraph 8)

What must happen when IMDS is inoperative?

Refer to same procedures for MICAPs and non-MICAPs when IMDS is operational. Back order through 96 LRS to include an authorized verifier and give all pertinent data. (paragraph 7)

What approval is required before removing bits and pieces from XD items?

All XD items require item manager approval before removal. (paragraph 8)

What economic repair limit applies to removing bits and pieces from condemned assets?

Only items not exceeding 75 percent economic repair criteria are allowed bits and pieces removed from items. (paragraph 8)

Ask Reggie.Bot a question about 46TWI23-101