442FWI13-212 — Range Planning, And Operations

442FWI13-212 governs range planning and operations, including restrictions and procedures for Cannon Bombing Range and Fort Leonard Wood Range 50.

Search 442FWI13-212

  • Publication number: 442FWI13-212
  • Title: RANGE PLANNING, AND OPERATIONS
  • Date: 2024-10-18

View 442FWI13-212 on armypubs.army.mil


It covers airspace, range restrictions, authorized training ordnance, weather, scheduling, safety, mission planning, and command and control. Compliance is mandatory, and restricted deliveries require review and adherence to published airspeed and altitude parameters.

Applies to: This instruction is applicable to all military, civilian and contractor personnel utilizing the Cannon Bombing Range and the Fort Leonard Wood Range 50.

Topics covered

  • Range scheduling
  • Airspace restrictions
  • Authorized training ordnance
  • Weather restrictions
  • Mission planning and coordination
  • Restricted deliveries
  • Manned-site over-flight restrictions

Questions and answers

What must pilots do for restricted deliveries?

Restricted deliveries available. Pilots must review and strictly adhere to all published parameters located in Table A2.11, specifically airspeed and altitude limitations. (paragraph 2)

Can aircraft fly directly over the Main Tower complex during delivery?

No direct over-flight of Main Tower complex or any manned position. (paragraph 3)

Where can aircraft point during delivery?

Do not point at towers or manned sites during delivery. (paragraph 3)

What are the minimum and maximum altitudes for VLD deliveries?

VLD min altitude is 900’ AGL, max altitude is 1500’ AGL. (paragraph 1)

What is the maximum altitude for LAT deliveries?

8,000’ AGL max altitude for LAT deliveries. (paragraph 2)

Ask Reggie.Bot a question about 442FWI13-212