30SWI99-103 — Aeronautical Operations And Testing In The Wcooa

30SWI99-103 governs aeronautical operations and testing in the West Coast Offshore Operating Area and its support resources.

Search 30SWI99-103

  • Publication number: 30SWI99-103
  • Title: AERONAUTICAL OPERATIONS AND TESTING IN THE WCOOA
  • Date: 2017-09-18

View 30SWI99-103 on armypubs.army.mil


It addresses range planning, airspace scheduling, flight safety analysis, real-time aircraft control, and Area Control Center services. It requires safety approval for missions involving supersonic flight or weapon system ordnance and sets procedures for test support.

Applies to: The provisions of this instruction apply to 30th Space Wing (30 SW) subordinate activities and special program offices supporting aeronautical operations and testing in the WCOOA.

Topics covered

  • West Coast Offshore Operating Area
  • Aeronautical test support
  • Airspace scheduling
  • Flight safety analysis
  • Supersonic flight safety approval
  • Weapon system ordnance
  • Area Control Center services

Questions and answers

What services does the Area Control Center provide for mission and participating aircraft?

The ACC will provide radar services (vectors and surveillance), flight following, Federal Aviation Administration (FAA) and Air Traffic Control (ATC) flight plan coordination, radar handoff, and related services for mission and participating aircraft. (paragraph 1)

What missions require pre-operation safety approval from 30 SW/SEL?

Obtain pre-operation safety approval from 30 SW/SEL for each mission involving supersonic flight or the discharge of any weapon system's ordnance, whether live or inert. (paragraph 3)

What support does 30 SW provide when designated as lead range?

When designated as lead range, 30 SW support will include: planning, analysis and development of flight safety criteria, scheduling of facilities and airspace, and real-time operational control of aircraft. (paragraph 2)

What does 2 ROPS/DOS schedule for WCOOA test procedures?

Schedule required airspace in accordance with mission planning requirements. (paragraph 3)

What does the AOCO manage during aircraft testing operations?

The AOCO will monitor ACC personnel and manage range assets during aircraft testing operations. (paragraph 1)

Ask Reggie.Bot a question about 30SWI99-103