19AWI21-124 governs procedures for preparing 19th Airlift Wing aircraft for functional and acceptance check flights.
View 19AWI21-124 on armypubs.army.mil
It addresses functional, operational, and high speed taxi checks, including when each type is used and required authorizations. It assigns requirements for aircraft preparation, quality assurance, aircrew actions, briefings, forms, checklists, and permanent records.
Applies to: This instruction implements AFPD 21-1, Maintenance of Military Materiel and applies to the 19th Airlift Wing.
HSTCs may be utilized instead of CFs with 19th MXG/CC and 19th OG/CC authorization, IAW AFI 21-101. (paragraph 1)
To minimize brake and tire wear while performing HSTC, coordinate with the FCF aircrew to ensure the aircraft is configured with the minimum fuel practical, but not less than Dash-1 operational fuel minimums. (paragraph 2)
Ensure all AFTO Form 781A, Maintenance Discrepancy and Work Document; to include the original grounding discrepancies are included for the review. (paragraph 2)
All CFs will use the following job control numbers. (JCNs): 8400-8424 as per Little Rock AFB 21-107, Job Control Number Assignment. (paragraph 11-201)
All dates and times should match each other. (paragraph 4)