STP 9-91J12-SM-TG — Stp 9-91j12-sm-tg, Soldier's Manual And Trainer's Guide, Quartermaster And Chemical Equipment Repairer, Mos 91j, Skill Levels 1/2

STP 9-91J12-SM-TG governs training and evaluation for MOS 91J Quartermaster Chemical Equipment Repairers at skill levels 1 and 2.

Search STP 9-91J12-SM-TG

  • Publication number: STP 9-91J12-SM-TG
  • Title: STP 9-91J12-SM-TG, SOLDIER'S MANUAL AND TRAINER'S GUIDE, QUARTERMASTER AND CHEMICAL EQUIPMENT REPAIRER, MOS 91J, SKILL LEVELS 1/2
  • Date: 09/19/2019
  • Proponent: T2COM
  • Status: ACTIVE

View STP 9-91J12-SM-TG on armypubs.army.mil


It contains standardized task summaries for preventive maintenance, battlefield damage assessment and repair, technical equipment maintenance, and laundry equipment operations. The tasks require Soldiers to perform maintenance, diagnose faults, identify repair parts, complete inspections, and document actions on maintenance forms.

Applies to: This manual applies to both Active and Reserve Component Soldiers.

Topics covered

  • Preventive maintenance checks and services
  • Battlefield damage assessment and repair
  • Decontaminating apparatus maintenance
  • Water purification equipment maintenance
  • Laundry Advanced System operations
  • Containerized Batch Laundry system operations
  • CBL washer assembly maintenance

Questions and answers

What must be completed before evaluating the equipment tasks?

Ensure all equipment and special tools are available before evaluation. (paragraph 7)

How is a failed performance measure scored?

The Soldier scores a NO-GO if any performance measure was failed. (paragraph 7)

What happens when a performance measure is failed?

If any performance measure was failed, then show the Soldier what was done wrong and how it should have been done to score a GO. (paragraph 7)

What must be done to complete field-level maintenance on the LADS?

Ensure all maintenance fault(s) are repaired in accordance with appropriate TMs and references. (paragraph 4)

What temperature must the water reuse tank maintain?

Monitor the temperature using the gauge installed on the front of the water recycle tank and maintain a temperature of approximately 120 degrees F. (paragraph 3)

Ask Reggie.Bot a question about STP 9-91J12-SM-TG