STP 9-91D13-SM-TG — Soldier's Manual And Trainer’s Guide, Tactical Power Generation Specialist, Mos 91d, Skill Levels 1, 2 And 3

STP 9-91D13-SM-TG governs standardized training and evaluation of critical tactical power generation tasks for MOS 91D.

Search STP 9-91D13-SM-TG

  • Publication number: STP 9-91D13-SM-TG
  • Title: SOLDIER'S MANUAL AND TRAINER’S GUIDE, TACTICAL POWER GENERATION SPECIALIST, MOS 91D, SKILL LEVELS 1, 2 AND 3
  • Date: 10/12/2018
  • Proponent: T2COM
  • Status: ACTIVE

View STP 9-91D13-SM-TG on armypubs.army.mil


It covers generator emplacement, grounding, cable installation, power system operation, preventive maintenance, diagnostics, repairs, and inspections. It includes tasks for hydraulic-pneumatic masts, welding machines, load banks, AutoDISE layouts, and electrical power requirements.

Applies to: This publication is for skill levels 1, 2, and 3 Soldiers holding Military Occupational Specialty (MOS) 91D and for trainers and first-line supervisors.

Topics covered

  • Generator emplacement and grounding
  • Tactical power system operation
  • Preventive maintenance checks and services
  • Generator and engine diagnostics
  • Hydraulic-pneumatic mast systems
  • Welding machine malfunctions
  • AutoDISE power layouts
  • Electrical power requirements

Questions and answers

What must remain closed while a generator is operating?

Always keep generator access doors closed during operation.

How far into the ground must the ground rods extend?

Ensure that the three-segmented ground rods are at least eight feet in the ground and no more than 1 foot exposed. (paragraph 3)

What must be completed after Electrical Power Plant III maintenance?

Ensure required maintenance forms have been completed. (paragraph 9)

What standard applies to operating the Electric Power Plant III?

Operate the Electric Power Plant III in accordance with TM 11-5985-368-34 and performance measures.

What must be done before repairing a hydraulic-pneumatic mast system?

Ensure task is within shop capability/authorization. (paragraph 3)

Ask Reggie.Bot a question about STP 9-91D13-SM-TG