STP 44-14T14-SM-TG — Soldier`s Manual And Trainer`s Guide, Mos 14t, Pariot Launching Station Enhanced Operator/maintainer, Skill Levels 1, 2, 3 And 4

STP 44-14T14-SM-TG governs Soldier training for Patriot Launching Station enhanced operator and maintainer skill levels 1 through 4.

Search STP 44-14T14-SM-TG

  • Publication number: STP 44-14T14-SM-TG
  • Title: SOLDIER`S MANUAL AND TRAINER`S GUIDE, MOS 14T, PARIOT LAUNCHING STATION ENHANCED OPERATOR/MAINTAINER, SKILL LEVELS 1, 2, 3 AND 4
  • Date: 03/15/2002
  • Proponent: T2COM
  • Status: ACTIVE

View STP 44-14T14-SM-TG on armypubs.army.mil


It contains MOS training plans and skill-level tasks covering launching station operations, maintenance, vehicles, missile reload, communications, STO techniques, and support equipment. Task standards require specified procedures, maintenance records, corrective actions, safety, and equipment protection.

Topics covered

  • Launching station operations
  • Launching station maintenance
  • Missile reload
  • SINCGARS communications
  • Surviving to Operate techniques
  • Patriot support maintenance equipment

Questions and answers

What must be completed when performing PMCS on the Patriot Automated Logistics System?

Completes the services on the PALS per TM 9-4935-606-12. Accurately completes DA Form 2404 or DA Form 5988-E and DD Form 314 per DA Pamphlet 738-750. Notifies section chief if an uncorrectable fault exists and if higher echelon support is required. (paragraph 3)

What maintenance records are required for PALS PMCS?

Accurately completes DA Form 2404 or DA Form 5988-E and DD Form 314 per DA Pamphlet 738-750. (paragraph 3)

What is required when correcting a fault in the Launching Station Enhanced Launcher Electronics System?

Isolates the malfunction to the faulty BRU(s) and replaces faulty BRU(s) within the time prescribed by local command directives. (paragraph 5)

What torque value is required for guided missile canister tie-down bolts?

Tightened four canister tie-down bolts to 60 foot-pounds. (paragraph 6)

What safety requirement applies when loading a guided missile canister onto the Launching Station?

Be extremely careful when performing reload. Observe all dangers, warnings, and cautions per technical manuals and drills. (paragraph 8)

Ask Reggie.Bot a question about STP 44-14T14-SM-TG