STP 11-25L13-SM-TG — Soldier`s Manual And Trainer`s Guide, Mos 25l, Cable Systems Installer-maintainer, Skill Levels 1, 2, And 3

STP 11-25L13-SM-TG governs MOS 25L Cable Systems Installer-Maintainer tasks for skill levels 1, 2, and 3.

Search STP 11-25L13-SM-TG

  • Publication number: STP 11-25L13-SM-TG
  • Title: SOLDIER`S MANUAL AND TRAINER`S GUIDE, MOS 25L, CABLE SYSTEMS INSTALLER-MAINTAINER, SKILL LEVELS 1, 2, AND 3
  • Date: 08/12/2008
  • Proponent: T2COM
  • Status: ACTIVE

View STP 11-25L13-SM-TG on armypubs.army.mil


The publication contains training and evaluation tasks for navigation, cable and equipment, multiplexers, telephone sets, maintenance vehicles, LAN/WAN substations, COMSEC, and conduit. Its task standards define required performance measures for installation, maintenance, testing, troubleshooting, recovery, and repair.

Topics covered

  • Navigation using the AN/PSN-11
  • RF cable installation and testing
  • Plastic-sheathed cable splicing
  • Fiber optic cable repair
  • Telephone cable troubleshooting
  • Underground cable systems
  • Multiplexer installation and maintenance
  • LAN/WAN substation distribution systems

Questions and answers

How many satellites must the status displays show during navigation setup?

Check status displays to ensure acquisition of four satellites. (paragraph 5)

What standard applies to RF connector assembly and cable testing?

Score the Soldier a GO if all PMs are passed. Score the Soldier a NO-GO if any PM is failed. (paragraph 6)

What result is required after splicing plastic-sheathed cable?

Spliced the cable and restored communications. (paragraph 9)

What limits apply when checking fiber optic cable attenuation?

Check for maximum of 3.0 dB for a 300-meter FOCA. (paragraph 750-8)

What records must be completed during unit-level maintenance on a cable test set?

Complete DA Form 2404 and DA Form 2408-14. (Refer to DA Pam 750-8.) (paragraph 6)

Ask Reggie.Bot a question about STP 11-25L13-SM-TG