STP 10-92L14-SM-TG — Soldier`s Manual And Trainer`s Guide, Mos 92l, Petroleum Laboratory Specialist, Skill Levels 1, 2, 3, And 4

STP 10-92L14-SM-TG governs training tasks for petroleum laboratory specialists across MOS skill levels 1, 2, 3, and 4.

Search STP 10-92L14-SM-TG

  • Publication number: STP 10-92L14-SM-TG
  • Title: SOLDIER`S MANUAL AND TRAINER`S GUIDE, MOS 92L, PETROLEUM LABORATORY SPECIALIST, SKILL LEVELS 1, 2, 3, AND 4
  • Date: 04/17/2008
  • Proponent: T2COM
  • Status: ACTIVE

View STP 10-92L14-SM-TG on armypubs.army.mil


It contains petroleum testing procedures for laboratory operations and quality surveillance, including apparatus, reagents, samples, calculations, reports, and PMCS. It also covers chemical solutions, fire and safety measures, environmental stewardship, laboratory equipment, PQAS, and mobile laboratory operations.

Applies to: As a petroleum laboratory specialist in a field or garrison environment, you are given an operational petroleum laboratory, all necessary manuals and materials, upon receipt of petroleum products laboratory specialist is required to conduct testing procedures based on product specification and special instructions.

Topics covered

  • Petroleum product testing
  • Saybolt color determination
  • Petroleum laboratory analysis reports
  • Standardized chemical solutions
  • Fire and safety measures
  • Environmental stewardship measures
  • Petroleum Quality Analysis System operations
  • Mobile laboratory operations

Questions and answers

How soon should conductivity measurements be made after sampling?

Conductivity measurements should be made as soon as possible after sampling and preferably within 24 hours. (paragraph 4)

How should electrical conductivity readings of zero be reported?

Report less than 1pS/M, if the electrical conductivity reads zero on the meter. (paragraph 5)

What should be done if a Saybolt sample is turbid?

Filter the sample through a sufficient number of qualitative filter papers until clear when it is turbid. (paragraph 3)

How often should the thermocouple be calibrated?

Calibrate a thermocouple when first installed and then normally every 30 to 50 tests thereafter, but at least every 6 months. (paragraph 1)

When should a solution titration be rerun?

If any solution differs from the means by +/- 0.0005N, rerun the titration process.

Ask Reggie.Bot a question about STP 10-92L14-SM-TG