PAM 420-1-3 — Transportation Infrastructure And Dams

PAM 420-1-3 governs project planning, execution, maintenance, repair, minor construction, and control of paved roads, airfields, railroads, bridges, and dams.

Search PAM 420-1-3

  • Publication number: PAM 420-1-3
  • Title: TRANSPORTATION INFRASTRUCTURE AND DAMS
  • Date: 04/09/2009
  • Proponent: G-4
  • Status: ACTIVE

View PAM 420-1-3 on armypubs.army.mil

Related publications


PAM 420-1-3 covers pavement condition ratings, drainage facilities, railroad track maintenance and safety, and dam coordination. It requires specified inspection, maintenance, planning, and emergency action practices.

Topics covered

  • Pavement condition ratings
  • Drainage facilities
  • Railroad track safety
  • Railroad maintenance planning
  • Dam safety coordination
  • Airfield pavements

Questions and answers

What management system is required for Army pavements?

Only PAVER will be used as the management system for Army pavements. (paragraph 6-23)

How often must railroad tracks be inspected?

Inspections will be made at least semiannually by a qualified inspector on every track segment to identify all routine maintenance tasks. (paragraph 2)

What happens when a railroad safety deficiency is found?

Safety deficiencies should be corrected immediately or a track restriction placed on the track until the deficiency is corrected. (paragraph 2)

How often must drainage channels, ditches, storm sewers, sub-drains, and culverts be maintained?

Maintain drainage channels, ditches, storm sewers, sub-drains, and culverts to function at full design capacity. As a minimum, maintenance will be done once in the fall and once in the spring. (paragraph 5-5)

What must dam coordination include?

Coordination should include preparing an Emergency Action Plan (EAP), updating emergency telephone numbers annually, and exercising EAPs at least every five years. (paragraph 2-2)

Ask Reggie.Bot a question about PAM 420-1-3