PAM 420-1-3 governs project planning, execution, maintenance, repair, minor construction, and control of paved roads, airfields, railroads, bridges, and dams.
View PAM 420-1-3 on armypubs.army.mil
PAM 420-1-3 covers pavement condition ratings, drainage facilities, railroad track maintenance and safety, and dam coordination. It requires specified inspection, maintenance, planning, and emergency action practices.
Only PAVER will be used as the management system for Army pavements. (paragraph 6-23)
Inspections will be made at least semiannually by a qualified inspector on every track segment to identify all routine maintenance tasks. (paragraph 2)
Safety deficiencies should be corrected immediately or a track restriction placed on the track until the deficiency is corrected. (paragraph 2)
Maintain drainage channels, ditches, storm sewers, sub-drains, and culverts to function at full design capacity. As a minimum, maintenance will be done once in the fall and once in the spring. (paragraph 5-5)
Coordination should include preparing an Emergency Action Plan (EAP), updating emergency telephone numbers annually, and exercising EAPs at least every five years. (paragraph 2-2)