ATP 3-09.02 governs field artillery survey planning, operations, methods, equipment, records, and coordinate conversion.
View ATP 3-09.02 on armypubs.army.mil
ATP 3-09.02 covers common grids, position area surveys, field notes, angle determination, survey computer systems, GPS applications, and coordinate transformations. It requires survey information to be checked through procedure, computation comparison, closure, and map verification checks.
Surveys are planned to ensure that all required control is provided in the correct place and at the time required. (paragraph 2-1)
A SOP standardizes procedures for those phases of operation that the commander wants to make routine. (paragraph 2-44)
To be effective, a survey SOP must be brief and must conform to established doctrine. (paragraph 2-49)
An SCP must be provided within 2 kilometers of the center of the battalion position area if the IPADS or IPADS-G is the primary method of survey. (paragraph 3-16)
All operators should be thoroughly trained on all functions of the system before using the PLGR. (paragraph 9-9)