ATP 3-01.50 governs doctrine and employment TTP for air defense and airspace management cell operations.
View ATP 3-01.50 on armypubs.army.mil
ATP 3-01.50 covers ADAM cell missions, roles, equipment, communications architecture, operations, airspace command and control, and system initialization. It describes ADAM cell structure, training, tactical employment, and operations, including requirements for communications, battle rosters, shift changes, and common operational picture management.
Applies to: There is ADAM cells in the corps, division, brigade combat teams (BCTs) (Heavy, Infantry, and Stryker) and the five support brigades (Aviation, Fires, Battlefield Surveillance Brigade [BfSB], Combat Support Brigade [CSB], Maneuver Enhanced [ME], and Sustainment).
Better describing how to integrate several integrating processes (the military decision-making process [MDMP]; targeting, intelligence preparation of the operational environment; intelligence synchronization; and composite risk management) with each other and throughout the operations process. (paragraph 5-0)
The ADAM cell is comprised of a prime mover, an AN/TSQ-253shelter, and power generation equipment with trailer. (paragraph 1-19)
The rigid wall shelter (RWS) protects ADAM cell personnel from chemical, biological, radiological, and nuclear (CBRN) attacks and has power, local area network (LAN), and antenna connections on both sides of the structure. (paragraph 1-20)
Each section within the CP must maintain a battle roster listing the section operators assigned to each BAS. (paragraph 4-24)
At a minimum, sections should plan for three operators per system: two Soldiers to man a 12-hour shift each plus one Soldier to serve as a backup and to provide periodic relief. (paragraph 4-24)