AR 750-43 governs Army policies for test, measurement, and diagnostic equipment, test program sets, embedded diagnostics, and prognostics.
View AR 750-43 on armypubs.army.mil
It covers TMDE administration, acquisition, calibration and repair support, TPS policy and management, and related embedded diagnostic and prognostic data. The publication requires acquisition approval for TMDE and makes TPS and calibration support procedures mandatory.
Weapon system developers and system managers will forward requests to the PD TMDE at least 90 days (120 days for ATE) prior to anticipate contractual or in-house commitment to procure the TMDE. (paragraph 4-3)
Acquisition requests for TMDE will be submitted on DA Form 4062 (TMDE Acquisition Approval Analysis Data) in accordance with DA Pam 750 43. (paragraph 3-2)
TPS requirements in DA Pam 750 43 are mandatory. (paragraph 5-1)
TPSs are a combination of interface devices, software test programs (for example, those residing in logic storage media or in permanent digital memory), and documentation (for example, technical manuals and technical data packages) that together allow the ATE operator to perform the testing or diagnostic action on the unit under test (UUT). (paragraph 5-1)
Provide TMDE C&RS and ensure that all measurements performed using calibrated TMDE are traceable to the SI. (paragraph 6-1)