AR 70-75 — Survivability Of Army Personnel And Materiel

AR 70-75 governs combat survivability policies, responsibilities, and procedures throughout the life cycle of Army systems and materiel.

Search AR 70-75

  • Publication number: AR 70-75
  • Title: SURVIVABILITY OF ARMY PERSONNEL AND MATERIEL
  • Date: 04/29/2019
  • Proponent: ASA (AL&T)
  • Status: ACTIVE

View AR 70-75 on armypubs.army.mil


AR 70-75 addresses survivability in acquisition strategies, requirements documents, system design, threat analysis, testing, and evaluation. It requires survivability considerations throughout acquisition phases and establishes criteria for mission-critical systems, personnel, and materiel.

Topics covered

  • Combat survivability
  • Survivability requirements
  • Threat assessment
  • Survivability analysis
  • System design
  • Survivability testing
  • Mission-critical systems
  • CBR contamination survivability

Questions and answers

When must Army acquisition strategies address survivability?

Survivability will be addressed in acquisition strategies for all Army materiel. (paragraph 7)

During which acquisition phases must survivability be considered?

Survivability will be considered during all acquisition phases. (paragraph 7)

What must the initial capabilities document define for survivability planning?

The initial capabilities document (ICD) will define the shortfalls or deficiencies of existing capabilities, the missions expected operational environment, and the level of desired mission capability in these environments. (paragraph 7)

What survivability information must the CDD and CPD incorporate?

The capabilities development document (CDD) and capabilities production document (CPD) incorporate system survivability requirements, identifying survivability thresholds and objectives, and specify whether or not the need is mission critical. (paragraph 7)

How long does survivability analysis continue?

Survivability analysis is a process that starts during the pre-acquisition phase and continues throughout the life cycle of the system. (paragraph 4)

Ask Reggie.Bot a question about AR 70-75