AR 5-18 — Army Stationing And Installation Plan

AR 5-18 governs the Army Stationing and Installation Plan and its official databases for Army installation planning populations.

Search AR 5-18

  • Publication number: AR 5-18
  • Title: ARMY STATIONING AND INSTALLATION PLAN
  • Date: 08/05/2022
  • Proponent: G-9
  • Status: ACTIVE

View AR 5-18 on armypubs.army.mil


It establishes processes for collecting, analyzing, updating, and distributing stationing and installation population data. It covers force structure, training and tenant loads, geographic attribution, planning windows, databases, reports, website access, and certification requirements.

Topics covered

  • Army Stationing and Installation Plan
  • Installation planning populations
  • Force structure data
  • Training and tenant loads
  • Stationing and installation databases
  • ASIP reports and website

Questions and answers

How far ahead does the ASIP planning window extend?

Provides the user with a 7-year planning window. (paragraph 2-2)

When must commanders provide recommended ASIP report changes?

Within 60 days of receipt of the report, provide recommended changes through appropriate channels to the HQDA proponent for inclusion in the source databases (such as SAMAS, DRRSA, FMSWEB, ATRRS, ARNG, and USAR unit locations). (paragraph 1-14)

Who can access the unclassified ASIP website?

The unclassified website (https://asip.hqda.pentagon.mil) is available to authorized users worldwide, through a series of HQDA-approved security protocols. (paragraph 2-5)

Ask Reggie.Bot a question about AR 5-18