AR 420-5 governs Army fire and emergency services policy, programs, procedures, and capabilities to minimize loss of life and property damage.
View AR 420-5 on armypubs.army.mil
It addresses fire incident reporting and investigations, dispatch operations, community risk assessments, service delivery, staffing, apparatus, prevention, equipment, training, and military firefighters. It requires reporting specified major fires, annual risk assessment updates, written plans below reduced staffing, and standards-based protective equipment.
Applies to: This regulation applies to the Regular Army, ARNG, USAR, and tenants, concessionaires, and contractors on Army installations, except as noted in paragraphs 21a through 21d.
Installations will review, approve, and transmit the report to ACOMs, ASCCs, and DRUs within 24 hours of the fire incident. (paragraph 4-5)
Installation risk assessment must be reviewed and updated on an annual basis, when any significant changes to the infrastructure occur, or new mission requirements that change the risk profile. (paragraph 5-1)
Operating below the reduced level requires preapproved, written risk management plans. (paragraph 7-1)
Operating at the severe level continuously for periods of more than 72 hours is prohibited, except that fire stations serving rural areas may operate continuously at the severe level with the garrison commander written approval in the risk management plan. (paragraph 7-1)
If a conflict exists between DoD, NFPA, CFR, NWCG, or OSHA standards the more stringent standard will apply. (paragraph 10-1)